NPP Projection Report 7/31 Admin

To do this evening/ was completed: Remember to update the posters and marquee for the two new titles tomorrow. We're also losing 28 Years Later . Tomorrow, Bad Guys 2 , The Naked Gun , and Batman Forever will need to be checked for volume levels . We got a video message from the director of BG2 via Deluxe telling us to play it at 7.0 but we can be the judge of that. I didn't mention this in yesterday's blog, but I looked at CatVideoFest so that is all set. As usual, it's a hot and fairly inconsistent mix. Also this year's edition is in a 2.00:1 aspect ratio, though the only portion I saw that fills this frame completely is the end credits. Presentation Issues: Preshow Clips/Playlist: Weapons and Suburban Horror preshow clips and some in-house trailers showed up on the Share folder, I ingested them. Trailer Updates: Special Events/ AV set up:  The school screening this morning went well. Mic is good to go in T3 for Brooklyn Knight. The boxing event in T2 tonight ...

NPP Projection Close 7/30

To do this evening/ was completed: To Live and Die in L.A. went smoothly. Print is back heads out for now.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

Projection Admin 7/30

To do this evening/ was completed: Staff Screenings are out, Weekly email is out. Everything has been scheduled/blocked. I also sent out another email regarding my time off and what I'd like to see happen and what I'll be shooting out small reminders for. Please do get yours eyes on it when you can. Thanks!! - LH  Presentation Issues: Preshow Clips/Playlist: playlist for To Live and Die all set. - LH Trailer Updates: Special Events/ AV set up: We have a shorts program on 8/12. We received the drive last night and I started DCPing them today, in 4/6. The drive is labeled Ratigan, but shows up as Non Films 1TB ExtHD, just so you know. I have DCP'd the first three films to the George Ivan drive in a folder labeled ShortsProgram_081225, just to keep things organized. Please feel free to continue DCPing this evening, before the show. - LH  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): KDM reminders: Batman Forever keys open up on Friday, 8/1.  Ke...

NPP Projection Mid-Close (Alec & Will) 7/29

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Alec was here to run the LiveSound event in theater 1 this evening. He ran a sound check with JG Thirlwell before the show. John gave a short introduction before the short and feature started Ordering/Receiving (posters & trailers): Posters for Soul on Fire were delivered and stored behind the lobby bar  Ordering/Receiving (content): Received a hard drive from Brian Ratigan for the DarkRoom/Non Films event in theater 3 on 8/12 Keys for The Mastermind were delivered via Deluxe Outgoing/Shipping (content): Print/video Inspection: Finished inspecting Best of the Best II and updated the inspection report Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/tomorrow's schedule and initialed for confirmation Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projectio...

NPP Projection Close 7/28 + 7/29 Admin

To do this evening/ was completed: Running Man went smoothly, print has been re-inspected and packaged up. Yet to schedule pickup. T2 shutdown playlist did not cause the projector lamp to shut off. Caught it at the end of the night. Scheduled the week in the LMS. Best of the Best II arrived. Inspected the last three reels, the rest can be inspected this evening. So far nice condition. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes. Cue sheets and automation set for next week. The only event that needs its timing fully written out is for  A Photographic Memory  on Wednesday, 8.6.  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Admin (Lillian & Will) 7/28

To do this evening/ was completed: Ran house checks throughout the building this morning (no issue with the dowser in theater 1 as experienced yesterday morning -- all first rounds started normally today) -WB Built and scheduled the school screening for this week.  Sent out Staff Screening info a little early as Together opens up Wednesday.  We will also be having an encore of F1, per Matthew's request. Everything has been built/scheduled on the LMS and google calendar. - LH  Presentation Issues: Re: last night's dowser issue. I looked through the logs and didn't see anything out of place, nor did the projector look to be in poor health. Everything is healthy and operating well. I'm going to once again assume that the dowser got caught. If this happens again, please close/open again to see if that does the trick rather than shutting it down! - LH  Preshow Clips/Playlist: Added the "Classof95_25min" preshow file to all special event show playlists requiring it ...

NPP Projection Admin 7/27

To do this evening/ was completed: Presentation Issues: First round in theater 1 started as scheduled with no picture, only sound. Tried opening and closing the dowser/striking the lamp but these quick fixes didn't work. Quickly rebooted the projector while there was still enough time during the pre-show which ultimately resolved the issue. There were about five minutes left prior to the trailers beginning that there was an image on screen. MODs alerted me and we stayed in contact throughout the fix Eddington (1:45PM showtime, second round in theater 3) was meant to be an OCAP show but the CCAP version was scheduled and played instead. The OCAP version was scheduled and played yesterday at this same showtime. I had checked the weekend's cues on Friday but did not catch this until the feature was starting this afternoon Preshow Clips/Playlist: Built show playlists for Batman Forever , Creepshow , La Haine , and The Man in Possession (sans the "Classof95_25min" pre-show...

Projection Close 7/ 27

To do this evening/ was completed: Inspected Kwaidan, which I'm bummed to miss because it looks great! Print report all sorted.  We received a massive box of merch for Cat Video Fest, which is in the 4/6 booth.  Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Since we're low on house reels in T1 at the moment (many a print in house) I've put Kwaidan on its shipping reels Tails out so it'll be ready for heads out on house reels when the time comes.  Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Checked!  Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/26 Open

To do this evening/ was completed: Please put the battery for the vacuum cleaner on to charge after using it. Both batteries were almost dead this morning. They don't last very long, so make sure they have a full charge for the next person. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up:  Jetsons intro had no problems. Mic is put away and mixer off. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the DCPs for the boxing event on the 31st.  Outgoing/Shipping (content): Print/video Inspection: I started inspecting Kwaidan , there's a little bit of damage here and there but nothing crazy. There's an in and out emulsion scratch through reel 3; there are significant periods where it does not appear but it shows up in sections from beginning to end. That said, I think this should look very good. Hard not to take a bunch of pictures of this one, they are on the drive. Asset tracking doc updated/check...

NPP Projection Close 7/25

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built an A1 show playlist for Cat Video Fest Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Teaser posters for Keeper were delivered and stored behind 3/7 Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Finished inspecting La Haine and placed it on house reels + uploaded some stills to the shared drive Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked and adjusted all cues for the weekend and cross referenced the schedule and website + initialed for confirmation Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Additional Notes: Added more digital titles to the special event dry erase board in 4/6

Projection Admin 7/25

To do this evening/ was completed: Ingested all new preshow content and built all A1 playlists with the exception of CatVideoFest--that can get made tonight. Creepshow on house reels. Kwaidan and La Haine prints arrived. Fedex picked up Punks. Presentation Issues: Preshow Clips/Playlist: Went over Brooklyn Knight in T3, Sonder short and Feature for 7/31 in T1 with John. Double checked a few things for sound/image. Everything looks good. - LH Trailer Updates: Special Events/ AV set up: Started transcoding the DCP of Prime Time in 4/6, then Ali Reincarnated in T1 (both are for the private event on 7/31 in T2!) LH Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested the following content: Mastermind (screener in T3 on 8/1!), Photographic Memory - LH   Outgoing/Shipping (content): Sorted the labels for Punks. Getting shipped out today. - LH Print/video Inspection: Tech'd Running Man in T1 (which looks great!) info noted on the white card - LH Asset t...

NPP Projection Close 7/24

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Posters for The Running Man , Roof Man , and The Spongebob Squarepants Movie  were delivered and stored behind 3/7 Ordering/Receiving (content): Downloaded and converted all special event slides for the month of August to DCP ( Clueless , Showgirls , and The Babysitters Club ) and saved them to the George Ivan drive Outgoing/Shipping (content): Print/video Inspection: Spent the majority of the evening inspecting The Running Man  (the print is in good condition overall with some very light scratching throughout) + uploaded some stills to the shared drive Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/tomorrow's schedule Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Yes Addition...

NPP Projection Report 7/24 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Edited the playlist for Live Sound Cinema next week. Confirmed with the performer that the short should play with sound. The feature should be muted as usual. I looked at both films. Feature is 1.37 so I added that lens/mask change pack. The event memo indicates a shorter preshow, 6:35-7:00, so I removed the 25min clip. Built and scheduled Brooklyn Knight . Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested Bad Guys 2 and Naked Gun Outgoing/Shipping (content): Print/video Inspection:  In addition to the content for Live Sound Cinema , I looked at the new Jetsons Movie DCP (thanks, Will, for resizing!) and Brooklyn Knight. Both are quite loud, cued them at 4.8 and 4.0, respectively. Brooklyn Knight has no credits, so I added 2 mins of black to the end with a lights up cue. Brought  Fantastic 4  up to 5.5. Asset ...

Projection Mid/Close 7/23 (Lillian & Will)

To do this evening/ was completed: Went through the playlists for Punks/Gunsmith Cats just to double check everything. Ran loops and ran a reel of Punks just for posterity and to make sure focus was extra solid. The show went really well tonight despite the Q&A going over. We kept preshow lights on for trailer for Superman (3rd round) for waitstaff.  - LH  Staff Screenings are out and blocked on the calendar/LMS. - LH  Weekly update is out! - LH  Downloading Prime Time for 7/31, which we need to DCP. Getting more info on the rest soon. - LH  Presentation Issues: MOD radioed us to say that Gunsmith Cats was playing the english and Japanese audio at the same time. Went into the theatre and lo and behold, episode 2 (and only episode 2) had the correct Japanese dialogue with english subs, but it also had a faint english language track playing. Desmond and I techd all of these. Each one. I am still confused as to how this happened (likely the audio just didn't sa...

NPP Projection Close 7/22

To do this evening/ was completed:  Presentation Issues: Preshow Clips/Playlist: Double checked the show playlist for  Gunsmith Cats , scheduled it on Screenwriter, and updated the cue sheets (will need to take a look at this tomorrow for exact "start credits" timing but end has been noted for now) Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Caught Stealing  one sheets were delivered and stored behind 3/7 this afternoon Ordering/Receiving (content): The Running Man print was delivered and brought to booth 1 Transferred  Heaven and Earth Magic feature content to the LMS Began converting Sonder  to DCP and saved it to the George Ivan drive The Jetsons finished converting to DCP and can be ingested and tested alongside the file for  Sonder tomorrow morning Together feature content was delivered via Deluxe but is not yet available on the FilmVault menu...will update/ingest the content if it becomes available thi...

NPP Projection Admin 7/22

To do this evening/ was completed: Another solo show from ol' Kegg here with loads to do in preparation for the coming week.  Presentation Issues: No issues Preshow Clips/Playlist:  ZEISM ,  Heaven and Earth Magic & Sounder, Together ,  Boxing Raw and Uncut , and  Jetsons  playlists need to be built.  Trailer Updates: No issues Special Events/ AV set up: Swapped out the lenses in Theater 4 to 1.37 for Man in Possession Ordering/Receiving (posters & trailers): No issues Ordering/Receiving (content): Desmond sent us the file for The Jetsons Movie . I started a DCP conversion onto George Ivan.  We also got the Heaven and Earth DCP from John and the mov file for the short in front of it. I downloaded the short (SONDER_CREDITS) onto the desktop.  Outgoing/Shipping (content): I packed up Tango & Cash , it still needs labels Print/video Inspection: Cristina came by to look at two full reels of Man in Possession , which are loo...

Projection Close 7/21 Lillian/McKegg

To do this evening/ was completed: McKegg and I were on tonight to tag team the three events we had going on here tonight. Overall, everything went well, but I definitely have a few notes. See below.  Once I finished the print I took over for McKegg in T1.  We were both able to kick off NoBudge/Vanisher  Presentation Issues: Preshow Clips/Playlist:  Trailer Updates: Special Events/ AV set up: Tango and Cash went very well in T4 and I had a lot of fun projecting it. Tough print to focus, but it looked great! Full house for that one.  NoBudge was moving perfectly until the dowser got caught during a lens change for one of the shorts towards the end of the program - during the lens/masking change to 1.66 for Right to Remain Silent. Desmond radioed and I saw on the christie touch panel that the icon for dowser open was, in fact, on, but once I saw that it wasn't physically open, I hit "close" then "open" again and it worked. Quickly rewound to the beginning. The wh...

NPP Projection Report 7/21 Admin

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: I think the upload of the Mar2025 ABC preshow (for the Punks playlist) to the Share folder got interrupted, because Screenwriter is saying it's corrupted. I just downloaded it from Google Drive and added it to the playlist. Trailer Updates: Special Events/ AV set up: Ran loops for Tango & Ca$h tonight. Ingested the content and holding slide for the private event in T1 tonight, built and scheduled the playlist, and checked through it in the theater. I decided it made the most sense to run the whole playlist in 1.78 so I used that show start pack. 5.0 is plenty loud for the feature. Slide in place for intro and Q&A. Checked playlist for NoBudge. All good, noticed some minor aspect ratio things which I fixed ( Fever was letterboxed in 1.78, I made a new projector channel so it fits in the 1.85 masking, and Melonheads is 1.33, the masking preset had been changed for Phoenician Scheme and I put i...

NPP Projection Report 7/20

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Both brunch screenings went well today. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Content for the private event tomorrow is coming in tonight. Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Took down this weekend's brunch titles and put up the copy for the private event tomorrow. Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/19 Open

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Both brunch shows went well. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: I looked at the test clip for the private event on Monday in T1. Looks and sounds fine, shouldn't be any issues provided we get their final file with enough time to convert. One thing to note: this is in an odd aspect ratio, because of course it is. Looks like 1.5 or thereabouts, at least the test clip we've been sent is entirely in this ratio. Hopefully we'll get the file with enough time to check if this is the ratio for the whole thing and adjust masking if needed. Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 7/18 Close

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): I shared a Google Drive folder with the team for the private event on Monday, so they can upload their final version here instead of Dropbox. They asked me to password protect the folder, an impossibility, before they upload to it. I told them I couldn't and that it's only accessible to Nitehawk and the people in their group I shared it with, so hopefully they go with it and don't try to force a Dropbox link on us. Also, Chenelle confirmed this will be a ProRes (even though she asked them to provide a DCP since they're getting it to us so late), so we're going to have to convert it. Outgoing/Shipping (content): Deleted old playlists and content. Print/video Inspection: Inspected The Man in Possession . It's mostly good, though there is a small issue which shouldn...

Projection Admin 7/18

To do this evening/ was completed: Went through house checks this morning.  Friendly reminder to keep the Staff Screening playlists for Eddington/Smurfs since we'll be running them on Monday!  Presentation Issues: Preshow Clips/Playlist: Built/updated special event playlists. Deleted old playlists.  Peewee's Big Adventure all techd and ready to go in T1 this weekend!  Trailer Updates: Checked all current first run trailers.  Special Events/ AV set up: School screening in T7went great!  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Alec, Chenelle and I are working out the private event situation on Monday. Test is downloading in 4/6.  Outgoing/Shipping (content): Handed off the print of Nickel Boys to UPS today.  Print/video Inspection: Reset the lenses to 1.85.  Tech'd Punks and To Live and Die in LA with Desmond today. We also went over the last short for NoBudge (which we received a little late). Looking good o...

NPP Projection Close 7/17

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Built a show playlist for Touch of Evil (Director's Cut) for 7/26-27  Built all first run show playlists for next week with the exception of Together as we are still waiting on its feature content Trailer Updates: Special Events/ AV set up: Alec stayed on to run the Sabbath Queen screening in theater 3 (while I set up in theater 2) and uploaded the Q&A following the show Coming to America  played without any issue and the post-film discussion went on for an extra hour (mic is charging in the booth and the chair was returned to its hallway storage) Ordering/Receiving (posters & trailers): Honey, Don't!  posters were delivered and stored behind 3/7 Ordering/Receiving (content): Made a DCP slide for Punks  and transferred it to the LMS  Ingested all pre-show file elements from the 7/25 trailer list to the LMS so we can begin building SPLs for this week (in addition to all traile...

Projection Admin 7/17 Lil

To do this evening/ was completed: Got a little more info regarding upcoming private events.  7/31. Should be DCPs coming in (2 short films) but Chenelle will let us know soon if there's conversion needed.  New Menu change tomorrow! Presentation Issues: Preshow Clips/Playlist: Tech'd and adjusted volume for both Smurfs and Eddington today.  Trailer Updates: Special Events/ AV set up: Playlist for Coming to America has been double checked!! For the lights tonight, it will be stage right spots (201), then (203) for light blue wash for the Q&A but make sure you turn off the spots breaker beforehand (the setting is for spots/wash).  Sabbath Queen all set in T3. Intro/Q&A slides are good. Mics are ready.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Ingested Gunsmith Cats films.  Outgoing/Shipping (content): Nickel Boys will get picked up tomorrow by UPS.  Print/video Inspection: Asset tracking doc updated/checked?: ...

NPP Projection Report 7/16 Close

To do this evening/ was completed: Heads up I am copying the Pavements DCP to the Williamsburg share folder from the P&T drive. It should be done by midday tomorrow. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Inspected the Punks print. It's in quite nice shape with a bit of minor wear. Should run very well. Inspected Creepshow as well. This is a bit more beat up but not much. Pretty consistent light base scratches throughout which will likely be visible during brighter scenes (especially toward the end). Great color, though, and little physical damage. I'm sure it will look very good. It's tails out on the shipping reels for now. Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): There were a few issues on the cue sheet for tomorrow. Neither event...

Projection Admin 7/16

To do this evening/ was completed: There is a FOH meeting tomorrow, so I've scheduled staff screenings for Friday and Monday, steering clear of T1 for any maintenance.  Weekly update is out and it is imperative that you read the introduction. Thank you! Note: Punks can get inspected this evening. We have a tech this Friday.  Presentation Issues: Preshow Clips/Playlist: Adjusted the F1 playlists.  Trailer Updates: Special Events/ AV set up: School screening went well today! Started earlier than 10:30, which was great.  Cristina put me in touch with the host for the shorts program on the 12th of August. I looped in Alec since I'll be gone in August, despite being able to help with prep. Deadline for content delivery will be the 29th of July. In touch with the NewFest folks for accessibility features we can accommodate.  Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Received and ingested the director's cut of Touch of Evil . Mentioned ...

NPP Projection Close 7/15

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Nickel Boys  screening in theater 1 went smoothly (recorded the intro and Q&A to the booth desktop, copied it to the George Ivan drive, and sent it to Desmond) Trivia at Trees Lounge this evening went well (I set up everything prior to the screening in 1 and McKegg stayed on to make sure Shay had everything in order before she got things underway) Ordering/Receiving (posters & trailers): Additional Together posters were delivered and stored behind 3/7 Ordering/Receiving (content): Roman Holiday and  Touch of Evil were delivered via Deluxe this afternoon and evening (the latter has not yet showed up on the Deluxe FilmVault but the former was ingested) Outgoing/Shipping (content): Print/video Inspection: Nickel Boys is tails out in booth 1 and can be re-inspected tomorrow (there may be some interest in a staff screening for this...Desmond said there...

NPP Projection Admin 7/15

To do this evening/ was completed: It's just ollllll' Kegg here behind the helm for the morning with a fair amount to do  Presentation Issues: No issues Preshow Clips/Playlist: Built a playlist for Roman Holiday  Trailer Updates: No issues Special Events/ AV set up: I ran loops for Nickel Boys and set masking and should be all set for tonight.   Ordering/Receiving (posters & trailers): No issues Ordering/Receiving (content): We received prints for Creepshow and The Man in Possession and brought them to Theater 1 We also received Roman Holiday via Deluxe and I ingested it into LMS Outgoing/Shipping (content): No issues Print/video Inspection: No issues Asset tracking doc updated/checked?: Yes Maintenance/cleaning: Matthew came by to pick up a set of lights for the back of Theater 1 that will be installed next Monday.  We also received a new plastic reel for Nickel Boys .  Cue sheets updated/checked (every shift): Cue sheets for next week are fil...

NPP Projection Close 7/14

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Noticed theater 1 did not have a shutdown this evening until I realized there was a show playlist for F1 scheduled to start at 3:55AM...I removed this and the shutdown was rescheduled Updated and scheduled the Nickel Boys  show playlist for tomorrow Trailer Updates: Special Events/ AV set up: Death Becomes Her pre-film Q&A and screening went well (the Q&A was recorded to the booth desktop in theater 2) +  Beverly Hills Cop played without any issues in theater 3 this evening Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Coming to America keys were delivered via Deluxe Outgoing/Shipping (content): Removed Death Becomes Her and Beverly Hills Cop feature content from the LMS and their respective servers Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Double checked all cues/schedules for to...

Projection Admin 7/14

To do this evening/ was completed: Just a little note on KDMs - for films received through Deluxe, you don't need to upload keys, they will upload automatically to the LMS. I still like to double check, just to be sure, but they should be fine on their own.  Took a seat out in T1 row 5, right on the end. Chair is off to the side of MOD station area with drill up on the shelf, screws upstairs on the desk in 4/6.  Presentation Issues: Preshow Clips/Playlist: Death Becomes Her is all set for tonight. I did have to adjust the cue sheets quite a bit. Not sure what happened, it was mostly correct, but the end time for the Q&A plus credits info were all off. I adjusted volume. Slide looks good. House lights will come down during the trailer, right before the slide (I confirmed with Desmond). For center spots, use 103 = scene 1, bank 3 Beverly Hills Cop playlist tech'd.  Took a look at Sabbath Queen in T3, which looks and sounds great.  Playlists for the school screen...

NPP Projection Report 7/13 Close

To do this evening/ was completed: I found a spare screw and got 1622 in place securely for now, it's still missing one of the rear screws as the anchor for that one came out of the floor. Carly added this to the maintenance list for Juan. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Brooklyn Knight finished transcoding through DCP-o-matic and successfully ingested to the LMS. Outgoing/Shipping (content): Printed labels for Angel Terminators . Put this and Desperately Seeking Susan on the cart, pickup is scheduled for tomorrow. Print/video Inspection: Inspected Tango & Cash . I'm sure this will look great and it's in decent shape physically. Not much damage but a hint of vinegar and has a slight warp to it. Also some splotches throughout reel 1 which I don't think will be noticeable on screen. Asset tracking doc updated/checked?: Maintenance/clean...

NPP Projection Admin 7/13

Image
To do this evening/ was completed: Presentation Issues: First round pre-show started in theater 2 but the cleaning lights remained on...Wyatt radioed and I brought them down manually Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ran loops in theater 1 before the first round  Framing throughout Angel Terminators II was touch and go...the first reel, however expected, was still slightly off center, despite my centering the frame when I ran loops/threaded the countdown, and each subsequent reel never seemed to line up quite right with the plate so I made the necessary adjustments on the fly...all this aside things went smoothly and the crowd seemed pleased with the film Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Uploaded keys for Beverly Hills Cop and Death Becomes Her  (keys for the latter do not open until 8AM tomorrow) Outgoing/Shipping (content): Removed Pavements from the LMS/theater 3 Print/video Inspection: Tech'd Bever...

NPP Projection Report 7/12 Open

To do this evening/ was completed: I updated this in the manual, but please don't put blu-ray rips, or video files in general, through HandBrake unless we need to burn in subtitles. If the video needs to be resized, you can do that in DCP-o-matic and a better looking DCP will result, since the video has not been compressed by HandBrake. Instructions for resizing in DCP-o-matic are here . I set up the booth 5 PC to be remote controlled with Splashtop to see if that will be more reliable than 3/7 and 6 have been lately. Presentation Issues: Preshow Clips/Playlist: I couldn't tell if the updated bumper for Death Becomes Her had ever been ingested, in the playlist was something called "Broadway Trailer" which was made in May. I converted the new bumper to DCP (again, maybe), ingested it, and added it to the playlist. Trailer Updates: Special Events/ AV set up: Desperately Seeking Susan went well. Print is packed up. Cleaned the projectors. Ordering/Receiving (posters ...

NPP Projection Close 7/11

To do this evening/ was completed: Presentation Issues: A guest complained that the masking wasn't opened all the way for Superman in theater 1 during its final round...I checked on this and saw a sliver of image reflected on the left side curtain (these were open to 1.85:1 and the edge of the screen/picture was visible) which had become bunched up from opening up and stuck ever so slightly on the edge of the screen Had a couple sightings of "things on the screen" by MODs/guests this evening...these were bugs...not much to be done about this with doors opening and closing around the building but something to be aware of during shifts Preshow Clips/Playlist: Built all remaining PG-13 and R rated show playlists for the week of 7/18 (and reached out to Kat about potentially re-uploading the "Western_5min" preshow file as there was some difficulty getting it ingested to the LMS -- currently using a generic 5min file to fill time in the playlist) Built show playlists...

Projection Admin 7/11

To do this evening/ was completed: Bit tricky with a solo shift in regards to timing today, but managed to make it work.  In response to the Splashtop issue last night - I restarted the PC in T6, checked to make sure Splashtop settings were correct on there, then logged in and out of splashtop on 4/6 and it popped up. Working just fine. Presentation Issues: Preshow Clips/Playlist: NOTE - It has been a super busy week (particularly for Alec and I) and we need to keep the ball rolling on playlist building or scheduling, and flag when we are waiting on content. Pavements was ingested to the LMS but not T3, so I ingested it. We need to get eyes on this in between rounds, so I've instructed Will to do an credits/sound check. Playlist is built and scheduled for the weekend, as are the playlists for SOF and Desperately Seeking Susan .  NOTE: KDM for Beverly Hills Cop  goes live on Sunday   Built a bunch of SE playlists we have left for 7/11 and clarified the Coming to Ame...

NPP Projection Close 7/10

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Increased the feature volume level for Superman  in its playlists ever so slightly (from 5.0 to 5.3) since it sounded a bit low with the bigger crowds watching it this evening Trailer Updates: Special Events/ AV set up: Splashtop took the night off in 3/7 and failed to connect to the projection laptop no matter how many times I relaunched the app. Theater 6's rack PC was in such a state of deep sleep it began shutting down as soon as the screen finally turned on. Rebooted it and never got around to logging in to try connecting to Splashtop from there since it was taking forever to load. Ended up being pressed for time between bringing Nell an extension cord and resolving the sudden technical issue so I relinquished the 4/6 desktop to Michael via the laptop (this was the only thing Splashtop would connect to) so he could manage light/volume levels in theater 1 and get things underway. The show was delaye...

Projection Admin 7/10

To do this evening/ was completed: Presentation Issues: This was not major and has been fully resolved now, but the masking in T1 was at scope (presumably from Super 8 last night) all day today, it was a busy day so neither of us noticed/thought anything of it, only the masking did not go back to flat on cue for the start of the Superman playlist. I noticed when I went to check on the feature the curtains were at scope, and Superman is 1.85. Firing the cue again expectedly did not work so I brought the curtains in using the buttons on the motor. After the show finished I took a closer look and found, as I'd guessed, the wire to automate the #2 button (which activates the 1.85 preset) had snapped and was disconnected from the motor. Easy fix, I stripped/reconnected it. All set now. Preshow Clips/Playlist: Tech'd Sorry, Baby and Superman . Had to adjust the new Superman playlists a bit. Friendly reminder that Cat Vid Fest trailer is NOT 4.0. It is 3.5. This is listed on the w...

Projection Admin 7/9 (Didn't get posted! Yesterday morning's blog) Lillian

To do this evening/ was completed: In response to Will's blog last night, it looks like the playlists I made for Superman  7/04 (for 7/10 release date) were deleted and the 7/11 ones were copied over from F1, given everything that was in those incorrect Superman playlists from last night. there were updates earlier in the day, so please be be very careful if you are copying over to kill some time with not having to redo the trailers and such (if that was the intention). This is also why we double check the playlists. I still believe the template system might be too much for us here, but for right now, please be sure to double check your work. I am a tad concerned that Tuesday admin work has become slightly passive.  Also as per Will's blog, I checked out the faulty reel (reel one) of Nickel Boys which seemed to have multiple key pieces rolling around the core. I contacted Brad from Film Tech (in charge of this) and offered to tease them out but wanted to double check that thi...

NPP Projection Close 7/9

To do this evening/ was completed: Hank's Saloon went smoothly. Broke down the mixer afterward. Inspected the first two reels of the SoF print Angel Terminators II AKA The Best of Lady Kickboxers. It's in good condition, on house reels. Super 8 went very smoothly. Reels heads out right now. Mic returned to the booth. Eddington feature ingested to LMS.  Presentation Issues: MOD walkie'd to tell me there was a bit of a black dot in the center of T3 screen, possibly an insect. Went to check it out and didn't see anything there. But later I was in T1 before the print and saw a lightning bug flying around, then after the show I went to retrieve the mic and there were two bugs on the screen in T1.  *Three manual starts in T7 tomorrow night. Last round is on the scheduler even though the previous round will overlap it. Just leaving it there for now so that you see it's on the server.* Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (p...

NPP Projection Close 7/8

Image
To do this evening/ was completed: Presentation Issues: During the middle of the second round in theater 1 the lights override switch was tripped and the cleaning lights turned on. Fortunately, I was in the booth looking at a print as this happened and unplugged/plugged the light control panel back in, which brought the lights down, until they were tripped again a few moments later and went back to the cleaning/override setting. I unplugged it a second time and left it that way for the rest of the round (update: I plugged the panel back in at the start of the credits and manually brought the lights up, rebooted the server between shows and tested some content...everything seems back to normal for the time being) Preshow Clips/Playlist: Updated all Superman show playlists since each one had been built with the "Generic_Cars" pre-show in it, the Best of the Best II trailer, and a SCOPE lens/masking change (a format this movie is not in) that needed to be removed and replaced + ...

NPP Projection Close 7/7 + 7/8 Admin

To do this evening/ was completed: Scheduled the coming week with some SE exceptions. Put Susan on house reels, playlist built. Presentation Issues: Preshow Clips/Playlist: Playlists built for  Sorry, Baby.  Trailer Updates: Special Events/ AV set up:  Buena Vista  went smoothly, mics back in the booth.   Ordering/Receiving (posters & trailers): Ordering/Receiving (content): We received a flash drive with a DCP of Witchboard in a USPS envelope in 4/6 Outgoing/Shipping (content): Print/video Inspection: Noticed Sorry Baby is scope 2.20 (with no flat container version included), so I checked this screen file and masking in every house. I had to undo the Phoenician Scheme masking in most, but this is exclusively in Theater 5 for what is likely to be the remainder of its run so there won't be any problem with that feature. I made a Scope 2.20 lens/masking change pack and added it to the Sorry Baby playlists. -A Looked at  Super 8  and  Susan...

NPP Projection Admin (Lillian/Will) 7/7

To do this evening/ was completed: Leon Chase for Hank's Saloon came by to tech his film today. He's super happy with the outcome of his DCP and is really, really excited about the screening.  Presentation Issues: Preshow Clips/Playlist: Buena Vista Social Club is just about sorted for this evening -the hosts did not respond to our request for a good quality video of the Tony Awards performance that we could download, so I found it on YouTube and let them know. I made a DCP, which will likely sound good between 3.5 - 4.5, but we'll have 15min to tech it before we open doors for the show!  Superman playlists built - I swapped out the atmos file that was first ingested and got the regular 7.1 in there! Hanks Saloon playlist built Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Received posters for Lurker and Pavements and placed them behind 3/7 Ordering/Receiving (content): Downloaded and ingested the Superman pre-show Sorry, Baby i...